Annemiek Verbeek 8 januari 2016
Fire safety in the North/South line project: Designing measures for fire resistance in infrastructure

Engelstalige paper ten behoeve van het internationale ISTSS-congres, waar veiligheidsonderzoek centraal staan.
Samenvatting van de paper: In the North/South metro line project there are separate contractors for the concrete works and the finishing works. Additionally safety requirements were (re)defined during the concrete works and it was decided that fire protection of the submerged tunnel and the underground stations was to be handled in the finishing phase. This paper describes how the challenge of cooping with changed requirements was handled and how fire resistance was designed in the finishing phase.